Every number drafted
Accurate, tied out, and audit-ready.
Kaltheon
Product
Kaltheon produces your complete monthly billing package from your own contracts and cost data. Every number drafted. Every form filled. Every document checked. Every package ready for review.
Accurate, tied out, and audit-ready.
Matched to your general contractor's exact requirements.
Pay applications, waivers, insurance certificates, and backup in one package.
Issues flagged before the general contractor sends the package back.

Product
A monthly billing package is not one document. It is a stack of pieces that all have to be correct and consistent with each other. Kaltheon produces the whole stack from your contract and cost data, and checks that every piece agrees with the rest.
Complete package
Included documents
Pay application
Continuation sheet
Lien waivers
6 files
Accounting export
CSV
Package checks
Your billing on the exact form your general contractor requires, the standard industry forms or a general contractor's own custom version, filled and calculated.
Every line item on your job, with this month's progress drafted from your cost data and the math tied out against your contract.
Approved change orders are built into the billing, so you bill for the work that was agreed and nothing is left out.
The waivers required for this payment, generated from your own documents, including waivers for your suppliers and lower-tier subcontractors.
Your certificates included and checked for currency, so an expired one does not stop the payment.
Before it reaches you, Kaltheon runs the package against the known reasons packages get rejected, the math, the form, the documents, and flags anything worth a second look.
How it works
Kaltheon does the heavy work at the start, when you set up a project. After that, each month collapses to two things: enter this month's progress, and review what Kaltheon drafted.
Project
Draft amount
$482,650
Lines
248
Progress
82%
Status
Drafted
You bring your contract, your schedule of values, and the general contractor's form. Kaltheon reads the form once, you confirm it, and from then on every package for that project is built on it correctly. This setup happens one time per project.
Each month, your team enters how far each line item has come. That is the only recurring input Kaltheon needs. Everything else is drawn from what it already holds.
Every number is calculated against your contract, change orders are worked in, retainage is figured, and the waivers and certificates are pulled together. Then the package is checked against the reasons packages get rejected, before it ever reaches you.
Kaltheon shows you what it drafted and points you to anything worth a closer look, especially this month's new progress numbers. You approve, and the package is ready to send. Nothing is submitted without you.
Review highlighted items
Approve package

After setup
The first package takes setup. Every one after follows one clean monthly loop.
01
Update this month's line-item progress.
02
Check highlighted values and documents.
03
Approve the package and send it.
The system of record
Most billing tools are opened once a month and closed when the form is done. Kaltheon keeps the full billing picture, so each month builds on the last.
Billing history
Revised contract
$4,850,000
Billed to date
$2,845,300
Retainage held
$142,265
The agreed line items and prices for each job, held in one place, so every month's billing is measured against the same source of truth.
Every change to the contract price, tracked over the life of the job, so nothing agreed goes unbilled and nothing unapproved slips in.
Every package you have produced, period by period, so this month knows exactly what last month billed and what has already been paid.
The money held back on every payment, tracked as it accrues, so you always know what is owed to you and what is still being held.

Because Kaltheon holds the whole job, not just this month's form, every package is consistent with the one before it, and nothing has to be rebuilt from memory.
Your control
Everything Kaltheon produces is a draft for your review. It calculates, checks, and assembles, then stops and hands the package to you. The decision to submit is always yours.
Monthly billing package
Billed amount
$482,650
Progress
82%
Retainage held
$142,265
Kaltheon shows you the drafted package and points you to what deserves a closer look. Nothing is submitted automatically, ever.
Review highlights
Kaltheon does the arithmetic and the checking. The calls that need a person, especially this month's new progress numbers, are surfaced for you to approve.
When the package is right, you send it. Kaltheon does not send anything on your behalf.
Package status

Kaltheon removes the work. It does not remove you.
See the complete package produced on the forms your general contractors actually use, every number, every document, every check.
Book a demo